SYSTEM INNERWEB
Have you noticed a damaged sign, piece of infrastructure (barrier, safety net) or a cavity in the pavement? The InnerWeb system has a built-in module for reporting infrastructure failures. Use the simple form to report an obstruction or hazard.
CHALLENGE
In a workplace that is located in a large area and has many halls and warehouses, dozens of vehicles move every day, causing high exploitation of the road infrastructure. In order to keep the pavement in good shape, it is necessary to carry out constant inspection.
Passage of dozens of vehicles per day
Lack of ability to quickly report a defect
No information about the repair process
COURSE OF THE PROCESS
Wanting to meet the requirements of the customer and reduce the time required to fix failures related to road infrastructure. We have created a system that will allow you to report an infrastructure-related failure in just a few seconds. In the request you just need to specify:
- Location of the problem
- Description of the problem
- Damage photos
SOLUTION
Thanks to the failure reporting function, we have the ability to quickly respond to damage and view whether the process is running smoothly and there is no downtime. It is no longer necessary to exercise control over the work at the site where it is taking place. The actual collection of information can be used to analyze processes and make implementations to increase efficiency and optimization. The application allows thousands of data streams to be collected in one place, and automatically uploaded to the desired location. This makes it possible to learn from daily operations and continuously improve them.
BENEFITS
- Constant supervision of processes from anywhere on Earth
- Eliminate failures related to poor infrastructure
Bring progress to your production facility and set your sights on continuous development in the field of work organization
Want to learn more?
+48 668 669 011
Biuro otwarte 10:00 – 19:00
Email: